Munda Field PlannerInteractive demo — your data, nothing savedTalk about one job

Lay out a rough-in: enter the room, place fixtures, draw supply/drain/vent runs, set pipe and slope, and catch the missing decisions before the crew is in the dirt. Nothing is uploaded or saved.

Plumbing rough-in workspace

Planning aid only. Verify against local plumbing code, AHJ, permit authority, field conditions, and qualified professional review before real-world use.

1 · Room

What this means: anchor the model to one real taped measurement — invert elevations get verified in the field.

2 · Place fixtures

3 · Draw routes

    Enter the room length and width (step 1) to start the layout.

    Would you use this on a real rough-in? Tell us what it needs first →