Internal PM review: approval-needed items

Transfer switch needs replacement (found on site)

Needs approval

Impact: May add about half a day; materials cost varies

Customer-safe: We found the transfer switch should be replaced. This may affect price or schedule — we'll confirm before doing it.

Fuel line length longer than expected

Needs approval

Impact: May add minor materials; schedule likely unchanged

Customer-safe: The fuel run is a bit longer than planned. A small materials adjustment may apply; we'll confirm with you.

Tracking only — no e-signature, no contract, no payment. Final pricing/approval happen off-app.

Materials readiness

24kW generatorPlanned
Transfer switch (ATS)Verify on site
Concrete padReady
Feeder / conductorsReady
Fuel fittingsMissing

Daily field report

Completed today

  • Set + leveled the pad
  • Staged conductors

Blocked

  • ATS condition unconfirmed — pending site verify

Materials needed

  • Fuel fittings
  • Confirm ATS model

Next step

Confirm transfer switch, then set the generator

Customer-safe summary: Crew made progress on prep today. One item is being confirmed; we'll update you before the next step.

Job costing (rough)

Labor: 9h used of 24h plannedMargin risk: Medium

Materials: Most materials ready; 1 long-lead + 1 missing item to confirm

Preview only — a rough planning indicator, NOT accounting and NOT a final quote.