Static preview · planning aid only · fictional or browser-local data · no accounts, uploads, backend, sync, checkout, or payment

Founding pilot · manual service

Start with what you need done.

Pick a plain-language job goal, answer practical field questions, and copy a planning summary the Munda Field Planner team can review. Generator and electrical work is the focus today; other trades are welcome as early feedback pilots. See a sample packet first. No app login, no uploads, no payment collected here.

Start with text only. If the job is accepted, the Munda Field Planner team will tell you what non-sensitive details are safe to share next — do not send drawings, files, or sensitive customer information here. Use sample or redacted info only. No login, uploads, or payment right now. This is a feedback/demo planning aid — not official estimating, engineering, code, permit, or safety approval. At the end, copy your draft packet and send it to the Munda Field Planner team.

Text only · no uploads · no payment hereFree tester preview · future pricing not activeSee “Jobs we don't take” ↓ Preview the PM dashboard (demo) →
Run a 1-week pilot on one job

Use Munda Field Planner for one five-day job with a PM and one field worker. This is local-device and copy/paste only: no sync, accounts, uploads, drawings, photos, payment, backend, or real dashboard are active.

Day 1

Create packet

PM opens Plan a Job, answers plain-language scope questions, and saves the draft packet to this device.

Day 2

Verify missing information

Resume the saved job and walk the Items to verify on site. Mark anything still unknown as verify on site.

Day 3

Field update

Field worker uses the local field update or a copy/paste handoff bundle to log completed work, blockers, and verified items.

Day 4

PM / customer update

PM copies the internal PM update and the customer-safe update. Customer copy excludes internal notes.

Day 5

Handoff / export feedback

Copy the job bundle if work continues, then copy the week-end feedback score and send only redacted comments.

What to send back: Send only redacted feedback. Do not send names, exact addresses, drawings, photos, access codes, payment details, or sensitive customer data. Everything stays in this browser unless you copy and share it.

End-of-week feedback score

These answers stay on this device until you copy them. Text is optional and should be redacted.

Recent local changes

Fixed labels and timestamps only. No job text, names, addresses, files, photos, access codes, payment details, or private notes are stored.

No local changes recorded yet. Copy a packet, save/resume a draft, or copy a PM/customer update.

Munda Field Planner — weeklong pilot feedback
Send only redacted feedback. Do not send names, exact addresses, drawings, photos, access codes, payment details, or sensitive customer data.

Finished the week using it: Partly
Estimated planning time saved: 0 minutes (Saved a little)
What it caught early: Missing information
Would use again: Unsure
Would a future paid workspace be worth discussing after production gates: Unsure
Biggest friction, redacted: Not provided

Local change log (fixed labels + timestamps only):
- No local changes recorded

Local-device/copy-paste pilot only. No sync, accounts, uploads, drawings, photos, payment, or backend are active.
Planning aid only — not engineering, code, permit, stamped drawing, final quote, or safety approval.

Start with the strongest source of truth you have

  1. 1. Contract / scope of work — the agreement defines what's included and what's not
  2. 2. IFC drawings / engineered plans — routes, sizes, layouts, and equipment schedules
  3. 3. Site measurements / field dimensions — real numbers from the field, not drawings
  4. 4. Specs / manuals / submittals — manufacturer requirements, submittal packages
  5. 5. Photos / site notes — access, existing conditions, hazards
  6. 6. Timing & crew — schedule, shutdown window, crew size, trade sequence

Paste what you have. Tap “Not sure” for anything missing. The planner shows you what still needs to be confirmed.

Plan one electrical or generator job in ~3 minutes.

~3 minutes · text only · no uploads · no payment · planning aid only. Samples use fictional data — safe to explore and share.

Start your job plan0%

Saved only in this browser/device — not secure cloud storage. No account, no upload, nothing sent to a server. Clearing your browser removes it.

Step 1

What are you trying to get done?

Pick the closest plain-language option. You do not need to know the technical job name.

Likely job type: Pick an option to let the planner infer a category.
Step 2

Enter scope inputs — start with the contract

Optional. The planner already drafts a packet from your job type above. Add details to sharpen it — text only, no files or uploads.

OptionalAdd job details — contract, plans, measurements… →
Work from the top down: contract / scope → plans or drawings → measurements → specs / manuals → site photos / notes → timing & crew. Tap “Not sure” for anything missing. Text only — no files or uploads.
Step 3

Your packet

This draft is built from your answers. It is a planning aid for the Munda Field Planner team to review, not a quote, engineering work, code approval, or permit approval.

This is your Draft Packet Preview. Answer questions to improve it. Drafts may autosave in this browser only; nothing is uploaded or sent to a server unless you copy/email it yourself. Demo only — local to this device. All values are planning aids only.

Copyable plain-text summary — same packet, raw text view ↓
=== Munda Field Planner — Scope-First PM Planning Summary ===

LIKELY JOB CATEGORY
Needs site review — planner will classify after source review

PLAIN GOAL
Not selected

SCOPE INPUTS
1. Contract / scope of work: Not provided — verify on site.
2. IFC drawings / plans: Not provided — verify on site.
3. Site measurements: Not provided — verify on site.
4. Specs / manuals: Not provided — verify on site.
5. Site photos / notes: Not provided — verify on site.
6. Timing / crew: Not provided — verify on site.

CLARIFYING QUESTIONS
- What does the contract or scope of work say about this job? Summarize key inclusions and any noted exclusions.
- Are there IFC drawings, engineered plans, or sketches for this job? If yes, what equipment sizes, routes, or configurations do they show?
- What site measurements or field dimensions are available? Include run lengths, heights, distances, or confirmed quantities.
- Are there equipment specs, manufacturer manuals, or submittal sheets? If so, what are the key requirements (amperage, conduit size, pad dimensions, etc.)?
- Are there site photos or a notes summary? Describe any access constraints, existing conditions, or hazards observed on site.
- What is the schedule — start date, deadline, or outage window? How many crew members are planned, and are other trades sequenced around this work?
- Can you describe the plain customer goal in one sentence?
- What exists at the location today?
- Which trade do you expect will perform this work?

WORK PLAN (PLANNING ESTIMATE — VERIFY CREW AND DURATION)
- 1. Capture plain customer goal and available source documents | crew: PM | duration: 0.5 hr | depends on: —
- 2. Classify trade scope and identify stop-work / referral boundaries | crew: PM | duration: 0.5 hr | depends on: 1
- 3. List missing scope, access, material, schedule, and approval inputs | crew: PM + foreman | duration: 0.5 day | depends on: 2
- 4. Draft a task sequence for contractor review before dispatch | crew: PM + foreman | duration: 0.5 day | depends on: 3
- 5. Confirm field conditions and revise packet before crew work starts | crew: Foreman | duration: Varies | depends on: 4
- 6. Copy customer-safe update and internal PM notes after review | crew: PM | duration: 0.5 hr | depends on: 5

MATERIAL PLANNING CATEGORIES (DRAFT ONLY — NOT A FINAL TAKEOFF)
- Primary equipment / fixture category — identify after job type is classified; do not order from this draft
- Power / pathway / piping category — route, size, and length must be verified from plans and field measurements
- Mounting / support / access category — anchors, backing, lift, ladder, rigging, or site access as applicable
- Safety / isolation / protection category — PPE, LOTO, barricades, covers, or temporary protection as applicable
- Labeling / closeout category — labels, schedules, customer-safe notes, photos or documents only after approved secure upload gate

CUSTOMER-SAFE EXPLANATION
- We'll start with a site visit to classify the job and confirm scope before any work.
- No surprises — we'll discuss before we start and before anything changes.

INTERNAL PM / FOREMAN NOTES (NOT CUSTOMER-FACING)
- Scope not yet defined — all risk items TBD after site review
- Measurements not confirmed — scope, materials, and labor may change significantly after site visit.
- No IFC drawings referenced — verify all routes, sizes, and configurations against issued drawings before material order.
- Keep blocker language internal. For customers, use: scope clarification, may affect price or schedule, or contractor review needed.

ASSUMPTIONS
- This is a scope-first planning summary — not a quote, final bid, or approved plan.
- Verify all measurements, materials, access, and approvals against IFC drawings and on site.

DISCLAIMERS
Planning aid only. Not engineering, not code approval, not ready for permit submission, not a final quote, and not a safety sign-off. Verify with the qualified contractor, engineer of record, AHJ, utility, and manufacturer where applicable.

Your packet is ready — copy it

Draft in progress6 items to verifyPlanning aid only

NEC-related values are unverified planning aids until checked against official NEC sources and qualified review (VERIFY-NEC). Not engineering, code review, permit approval, a stamped drawing, a final quote, or safety approval — verify with the licensed team / engineer of record / AHJ.

My packet includes your internal planning notes; the Customer version leaves them out. Both are redacted text only · no files · no payment collected here.

More options (email · print · other copies) →
Email to the Munda Field Planner team

Email opens your own mail app pre-filled — review and press send yourself. Nothing is auto-sent. Redacted text only · no files · no payment collected here.

Direct submit isn't enabled in this demo.

This is a static preview with no server. Use Copy redacted scope + answers, Open email draft to the Munda Field Planner team, or Print / Save as PDF above to send your redacted draft. Redacted text only · no files · no payment collected here.

That's it — copy your packet above. Optional feedback and starting over are below.

No app login yet. No uploads in the app yet. Do not send sensitive files. Use text, redacted info, or summaries only. The Munda Field Planner team reviews requests manually. No payment is collected on this site. Planning aid only - not engineering, not ready for permit submission, not code approval, not a final quote, not a safety sign-off.
Step 4

Feedback & start over (optional)

Copy your packet in Step 3above — that's the main action. This part is all optional: clear your answers, or tell us how it went. Your answers stay in this browser unless you choose to copy/email them.

Help us improve this — optional questions

Local interaction log stores event names and timestamps only — never job text, addresses, names, files, or private notes. Data stays in this browser tab and is cleared when the tab closes.

Feedback/demo only. No uploads, no official estimating, no engineering/code/permit/safety reliance.

Advanced: use the old full form instead

Full form fallback

Use this if you already know the job type and want to fill in every field. Text only, no files.

Generator/electrical is our focus today; other trades are welcome as early feedback pilots.

Engineering, permit sign-off, emergencies, gas, and structural issues may be out of scope - the Munda Field Planner team will let you know.

Quick feedback

One tap opens an email to the Munda Field Planner team — no private job details are added.

Advanced: session diagnostics (on-device only)

Event names + counts stored in your browser only. No job text, names, contacts, files, or locations are ever recorded or sent.

What happens next

  1. Plan a job here and copy / email / print your draft packet — that's the product. Text only, no files, no payment.
  2. Want the full app later? Ask for a private tester invite. Tester preview is free right now. Future pricing is not active and there is no checkout or payment collected here.
  3. The Munda Field Planner team reviews requests manually. Out-of-scope or unsafe jobs (engineering, permit sign-off, emergency, or hazard work) are declined or referred out.
  4. Optional, not required: during the beta the team can hand-build a one-time setup packet from one redacted job to help you start. Optional setup help, not a per-job fee — any optional fee is confirmed by Munda LLC off-site.

Everything here is a planning aid only. It is not engineering, code compliance, a permit, a stamped drawing, a final quote, or safety approval.

Tester preview is free right now. Future subscription pricing is not active here. Invite-only beta · no checkout · no payment is collected on this site.

Jobs we don't take

This is a planning aid, not a licensed, engineering, or emergency service. Please don't send these — we decline:

  • Emergency or time-critical work.
  • Final code decisions or AHJ determinations.
  • Permit filings or stamped drawings.
  • Safety-critical sign-off or approval.
  • Any job requiring licensed engineering review.

For those, use a licensed electrician, the engineer of record, and your local AHJ.

Prefer copy/paste? Use this text template instead →

Copy, fill in, and paste into any email to fieldplanner@protonmail.com. Text only — no files.

Name / company:
Trade / job type:
Job location (general area only):
What is the customer asking for?:
What work is included?:
What is outside scope or uncertain?:
Measurements or quantities known:
Materials already known:
Schedule / deadline:
Crew / trades involved:
Customer decisions needed:
What output do you want most? (schedule / material list / customer packet / crew checklist / internal notes):
Any safety / permit / engineering concerns? (if yes, this may be out of scope):

Just want to give feedback?

No job in mind yet? Email us a few thoughts — the Munda Field Planner team replies personally.

Email feedback to fieldplanner@protonmail.com