Generator reviewer link · static preview

Generator starter packet review.

This route preloads the generator / backup-power starter packet so reviewers can see the richer work plan, draft material categories, and internal risk flags without relying on a query string or saved browser state.

Static preview only. Text-only sample/redacted review. No uploads, no accounts, no backend sync, no checkout, and no payment are active. Planning aid only: not engineering, not code approval, not permit approval, not a final quote, and not a safety sign-off.

Current generator review version: 22J.23 static generator review route

This link intentionally preloads the generator starter packet for reviewer checks. You should see 10 work-plan steps, 12 draft material categories, and generator risks for pad/foundation, rigging, fuel, ATS/switchgear, utility shutdown/LOTO, grounding/bonding, feeder route, and long-lead items. If you see the old generic category, a four-step TBD work plan, or empty TBD material planning, the browser or review tool is showing stale content.

Plan one electrical or generator job in ~3 minutes.

~3 minutes · text only · no uploads · no payment · planning aid only. Samples use fictional data — safe to explore and share.

1 of 7 answered14%

Saved only in this browser/device — not secure cloud storage. No account, no upload, nothing sent to a server. Clearing your browser removes it.

Step 1

What are you trying to get done?

Pick the closest plain-language option. You do not need to know the technical job name.

Likely job type: Generator, transfer switch, backup power, pad, feeder, or utility-coordination planning

Starter packet ready below for generator or backup power.

The draft already includes job-specific starter prompts, a planning work plan, material categories, customer-safe language, and internal PM/foreman notes. Add details only if you have them. Verify everything on site before real work.

  • Pad/foundation: compare existing pad size, new generator footprint, weight, anchor pattern, and whether structural review is needed.
  • Rigging/heavy lift: confirm crane access, gate width, ground bearing, matting/road plates, overhead lines, and road or parking closures.
  • Fuel system: confirm fuel type, line size/pressure, day tank, purge/disconnect responsibility, and whether fuel work is GC/plumber/customer scope.
Step 2

Enter scope inputs — start with the contract

Optional. The planner already drafts a packet from your job type above. Add details to sharpen it — text only, no files or uploads.

OptionalAdd job details — contract, plans, measurements… →
Work from the top down: contract / scope → plans or drawings → measurements → specs / manuals → site photos / notes → timing & crew. Tap “Not sure” for anything missing. Text only — no files or uploads.

Helpful details for a generator or backup power job

Include any of these in the scope inputs below. “I'm not sure / verify on site” is a safe answer for anything you don't have yet.

  • Existing service size (A) and voltage/phase?
  • Generator kW / model?
  • ATS rating (A) and SE-rated?
  • Existing feeder size and conduit path?
  • Pad condition / location (new or existing)?
  • Utility shutdown window available?
  • LOTO / shutdown constraints?
  • Fuel source and who coordinates it?
  • AHJ / permit known or required?
  • Site access and working hours?
  • Long-lead materials (generator, ATS, gear)?
  • Customer-facing outage window agreed?
Step 3

Your packet

This draft is built from your answers. It is a planning aid for the Munda Field Planner team to review, not a quote, engineering work, code approval, or permit approval.

Generator starter packet is visible first.

Start here before the copyable raw text. This is the foreman/PM view: sequence, materials, customer-safe wording, and internal risks in scannable sections.

10work-plan steps
12draft material categories
7job-specific prompts
11internal risk flags

Generator checks surfaced: pad/foundation, rigging path, fuel, ATS/switchgear, utility shutdown/LOTO, grounding/bonding, feeder route, and long-lead items.

This is your Draft Packet Preview. Answer questions to improve it. Drafts may autosave in this browser only; nothing is uploaded or sent to a server unless you copy/email it yourself. Demo only — local to this device. All values are planning aids only.

Draft packet preview — 13 sections (open for this sample)
Planning aid only. Not engineering, code review, permit approval, stamped drawings, final quote, field survey, or safety approval. Verify all details with a licensed professional, engineer of record, and AHJ before real-world use.

Customer-safe & scope

? Clarify — Clarifying questions — resolve before proceeding

  • What does the contract or scope of work say about this job? Summarize key inclusions and any noted exclusions.
  • Are there IFC drawings, engineered plans, or sketches for this job? If yes, what equipment sizes, routes, or configurations do they show?
  • What site measurements or field dimensions are available? Include run lengths, heights, distances, or confirmed quantities.
  • Are there equipment specs, manufacturer manuals, or submittal sheets? If so, what are the key requirements (amperage, conduit size, pad dimensions, etc.)?
  • Are there site photos or a notes summary? Describe any access constraints, existing conditions, or hazards observed on site.
  • What is the schedule — start date, deadline, or outage window? How many crew members are planned, and are other trades sequenced around this work?
  • What is the generator kW rating and manufacturer / model number?
  • Is this a replacement or a new install? If replacement, what is the existing unit?
  • Is there an existing ATS or will one be installed — and what is its rating?
  • Does the existing pad match the new unit footprint, weight, and anchor pattern, or is pad/foundation work needed?
  • What is the rigging path — crane access, gate width, ground bearing, overhead lines, and any road plates or mats?
  • What fuel system details are known — fuel type, line size/pressure, day tank, purge/disconnect responsibility, and who owns that scope?
  • Does the ATS/switchgear scope include bus work, bypass needs, control wiring changes, or one-line updates?
  • Is a utility coordination or shutdown window required?
  • Who owns the shutdown request, outage confirmation, and LOTO plan before cutover?
  • Is the existing concrete pad adequate for the new unit, or is a new pad required?
  • What grounding and bonding details are known — existing electrode system, new rods, bonding jumpers, and NEC Art. 250 verification?
  • Are generator, ATS, switchgear, gas piping, or utility work long-lead items that could affect sequence?
  • Are concealed conditions likely — masonry penetrations, unknown routing, blocked conduit, abatement, or hidden utilities?

? Clarify — Generator/electrical starter checklist

Starter prompts only. Use these to shape the packet until contract, IFC drawings, measurements, specs, site notes, and timing are filled in. Verify on site before real work.

  • Pad/foundation: compare existing pad size, new generator footprint, weight, anchor pattern, and whether structural review is needed.
  • Rigging/heavy lift: confirm crane access, gate width, ground bearing, matting/road plates, overhead lines, and road or parking closures.
  • Fuel system: confirm fuel type, line size/pressure, day tank, purge/disconnect responsibility, and whether fuel work is GC/plumber/customer scope.
  • ATS/switchgear: verify existing vs. new rating, SE-rated requirement, bypass needs, bus-work changes, control wiring, and one-line impacts.
  • Utility/shutdown/LOTO: identify who requests the shutdown, required lead time, outage window, temporary power needs, and LOTO owner.
  • Grounding/bonding: verify existing electrode system, new rods or bonding jumpers, and NEC Art. 250 items with qualified review.
  • Long-lead/concealed conditions: confirm generator/ATS/switchgear delivery dates plus masonry penetrations, blocked routes, abatement, or hidden utilities.

Scope inputs used

  • No scope inputs provided — verify all details on site.

Work plan (planning estimate — verify crew and duration on site)

#TaskCrew sizeEst. durationDepends on
1Review contract, IFC one-line, submittals, and shutdown responsibilitiesPM0.5 day
2Verify pad/foundation fit, anchor pattern, rigging path, and fuel tie-in scopePM + foreman0.5 day1
3Coordinate utility outage, LOTO owner, customer notifications, and temporary-power needsPM0.5 day1, 2
4Mobilize, barricade work area, stage crane/lift support, and protect existing gear2–30.5 day3
5Remove existing generator/ATS only if included and de-energized/verified20.5–1 day4
6Set generator on verified pad and complete anchoring/housekeeping checks2–3 + rigging vendor0.5–1 day2, 4
7Install or replace ATS/switchgear interface and control wiring per drawings20.5–1 day3, 6
8Install conduit/pathway, pull feeder/control conductors, land, torque, label2–31–2 days6, 7
9Complete grounding/bonding checks and fuel-system handoff verification2 + fuel contractor as needed0.5 day8
10Factory startup, functional test, inspection support, closeout packet, punch listPM + 2 + factory tech0.5–1 day7, 8, 9

✓ Customer-safe — Inclusions

  • Generator installation or replacement as scoped in contract and verified against submittals
  • ATS / transfer-switch installation or replacement as scoped in contract
  • Feeder, conduit/pathway, control wiring, labeling, and terminations as shown on verified drawings
  • Pad/foundation interface coordination when contract scope includes pad work or anchoring
  • Startup coordination and functional test support as scoped
  • All work per contract scope and applicable drawings — verify before proceeding.

✓ Customer-safe — Exclusions / not in scope

  • Utility company coordination beyond agreed notifications (unless in scope)
  • Fuel supply, fill, or ongoing fuel management
  • Structural / civil work beyond basic pad (confirm if pad is in scope)
  • Engineering design, stamped drawings, or permit filing (unless contracted)
  • Commissioning beyond the included start-up test
  • Anything not explicitly included in the contract scope — confirm with PM before starting.

Material Planning Categories

Draft planning categories only, not a final takeoff. NO FINAL ENGINEERED QUANTITIES. NO CODE APPROVAL. Verify with IFC/submittals/licensed team. Unit notes / verify-on-site flags apply to every line. Not a BOM or order list.

  • Generator unit — example: standby generator set, weather enclosure, battery charger, block heater; confirm kW/voltage/phase/model per spec
  • Automatic transfer switch / ATS — example: service-rated ATS, bypass/isolation if specified, control terminals; confirm rating and SE-rated requirement
  • Switchgear / bus interface — example: lugs, bus adapters, control wiring, one-line changes; verify bus-work, bypass needs, and EoR/AHJ requirements
  • Feeder / conductor category — example: phase conductors, neutral, equipment grounding conductor; verify size from IFC drawings/submittals/ampacity calc
  • Control cable category — example: start signal, annunciator, battery charger/alarm conductors; confirm conductor count per manufacturer wiring diagram
  • Conduit / pathway category — example: EMT/RMC/PVC, fittings, supports, pull boxes, sleeves, firestop; verify type, size, route, fill, and footage
  • Grounding / bonding category — example: grounding electrode bonding, jumpers, rods, exothermic clamps if required; verify NEC Art. 250 with qualified review
  • Fuel connection category — example: gas line/diesel day tank interface, flex connector, regulator, purge/disconnect; verify licensed fuel / gas contractor scope
  • Rigging / lift support category — example: crane, forklift, mats/road plates, lane closure, gate key, spotter; verify rigging vendor plan
  • Concrete pad / foundation interface — example: pad enlargement, housekeeping curb, anchor bolts, vibration isolators; verify structural review if in scope
  • Labels / signage category — example: equipment labels, arc-flash labels, shutdown signage, panel schedule updates; verify spec/AHJ wording
  • Misc hardware category — example: anchors, strut, weatherproof fittings, termination lugs, torque labels, sealant, housekeeping materials

Material list disclaimer

Draft planning categories only, not a final takeoff. Verify every item with IFC drawings / submittals / licensed electrical contractor / supplier / AHJ as appropriate. Not an engineered quantity or code-approved list — not a purchasing order, engineering BOM, or official code-review takeoff. No final quantities — confirm all on site.

✓ Customer-safe — Items to verify on site (18)

These details still need a quick on-site check before the plan is finalized. Planning aid only — not a completed field survey.

  • Contract / scope of work — not yet confirmed; verify on site.
  • IFC drawings / engineered plans — not yet confirmed; verify on site.
  • Site measurements / field dimensions — not yet confirmed; verify on site.
  • Specs / manuals / submittals — not yet confirmed; verify on site.
  • Photos / site notes — not yet confirmed; verify on site.
  • Timing & crew constraints — not yet confirmed; verify on site.
  • Open question — confirm before quoting: Do you have IFC drawings or submittals for the generator and ATS?
  • Open question — confirm before quoting: What is the target generator kW rating and model (if known)?
  • Open question — confirm before quoting: What is the physical size / footprint of the existing or proposed generator pad?
  • Open question — confirm before quoting: Is there adequate rigging / crane access and a clear path from delivery point to the pad?
  • Open question — confirm before quoting: Will the existing fuel system (tank, piping, vents, leak detection) be reused or fully replaced?
  • Open question — confirm before quoting: What is the utility / power company outage window or preferred cutover timing?
  • Open question — confirm before quoting: Is temporary power or a rental generator required during the cutover?
  • Open question — confirm before quoting: What is the planned ATS / service tie-in point and existing service equipment condition?
  • Open question — confirm before quoting: Have permits been pulled or has the AHJ been contacted for this generator install?
  • Open question — confirm before quoting: What are the customer / site access hours and any noise / vibration / exhaust constraints?
  • Open question — confirm before quoting: Are there any known long-lead equipment items (generator, ATS, switchgear, fuel tank)?
  • Open question — confirm before quoting: Any other site constraints (soil, access road limits, overhead lines, environmental, security)?

✓ Customer-safe — Customer-safe update

  • We'll coordinate the shutdown window with you before any work starts.
  • We'll verify the pad and protect existing equipment before setting the new unit.
  • If we find anything on site that may affect the price or schedule, we'll let you know before doing extra work.
  • Start-up and functional test are included — you'll see it running before we leave.
  • 18 details still need a quick on-site check before we lock the final plan. We'll confirm these with you and won't start extra work without checking first.
⚠ Contractor / internal planning notes — 3 (not customer-facing, tap to expand) ↓

⚠ PM internal — Unknowns / verify on site

  • Still open: Do you have IFC drawings or submittals for the generator and ATS?
  • Still open: What is the target generator kW rating and model (if known)?
  • Still open: What is the physical size / footprint of the existing or proposed generator pad?
  • Still open: Is there adequate rigging / crane access and a clear path from delivery point to the pad?
  • Still open: Will the existing fuel system (tank, piping, vents, leak detection) be reused or fully replaced?
  • Still open: What is the utility / power company outage window or preferred cutover timing?
  • Still open: Is temporary power or a rental generator required during the cutover?
  • Still open: What is the planned ATS / service tie-in point and existing service equipment condition?
  • Still open: Have permits been pulled or has the AHJ been contacted for this generator install?
  • Still open: What are the customer / site access hours and any noise / vibration / exhaust constraints?
  • Still open: Are there any known long-lead equipment items (generator, ATS, switchgear, fuel tank)?
  • Still open: Any other site constraints (soil, access road limits, overhead lines, environmental, security)?

⚠ PM internal — Change-order risks

  • Existing pad undersized for new unit footprint or weight → may require pad work
  • Anchor pattern or housekeeping pad does not match generator submittal → field adjustment or civil/structural review
  • Rigging path blocked by gate width, overhead lines, soft ground, or traffic control needs → lift cost/schedule impact
  • Fuel line size, pressure, purge/disconnect, or day-tank scope is unclear → fuel contractor / GC coordination needed
  • Conductor or conduit sizing mismatch vs. drawings → verify before ordering
  • Utility coordination more complex than expected → may affect schedule
  • ATS rating or wiring compatibility issues discovered on site
  • Long-lead generator, ATS, switchgear, or control components not on site → sequence may slip
  • Concealed site conditions blocking planned route
  • Measurements not confirmed — scope, materials, and labor may change significantly after site visit.
  • No IFC drawings referenced — verify all routes, sizes, and configurations against issued drawings before material order.

⚠ PM internal — PM / foreman notes

  • Timing and crew size: verify on site.
  • 18 items still to verify before quoting or ordering — confirm on site, against submittals/IFC drawings, or with the engineer of record / supplier / AHJ as appropriate.
  • Present risks as 'scope clarification,' 'may affect price or schedule,' or 'contractor review needed.'
  • Confirm stop-work conditions before crew deploys.
Copyable plain-text summary — same packet, raw text view ↓
=== Munda Field Planner — Scope-First PM Planning Summary ===

LIKELY JOB CATEGORY
Generator, transfer switch, backup power, pad, feeder, or utility-coordination planning

PLAIN GOAL
Generator or backup power

JOB-SPECIFIC STARTER PACKET (PROMPTS ONLY — VERIFY ON SITE)
- Pad/foundation: compare existing pad size, new generator footprint, weight, anchor pattern, and whether structural review is needed.
- Rigging/heavy lift: confirm crane access, gate width, ground bearing, matting/road plates, overhead lines, and road or parking closures.
- Fuel system: confirm fuel type, line size/pressure, day tank, purge/disconnect responsibility, and whether fuel work is GC/plumber/customer scope.
- ATS/switchgear: verify existing vs. new rating, SE-rated requirement, bypass needs, bus-work changes, control wiring, and one-line impacts.
- Utility/shutdown/LOTO: identify who requests the shutdown, required lead time, outage window, temporary power needs, and LOTO owner.
- Grounding/bonding: verify existing electrode system, new rods or bonding jumpers, and NEC Art. 250 items with qualified review.
- Long-lead/concealed conditions: confirm generator/ATS/switchgear delivery dates plus masonry penetrations, blocked routes, abatement, or hidden utilities.

SCOPE INPUTS
1. Contract / scope of work: Not provided — verify on site.
2. IFC drawings / plans: Not provided — verify on site.
3. Site measurements: Not provided — verify on site.
4. Specs / manuals: Not provided — verify on site.
5. Site photos / notes: Not provided — verify on site.
6. Timing / crew: Not provided — verify on site.

CLARIFYING QUESTIONS
- What does the contract or scope of work say about this job? Summarize key inclusions and any noted exclusions.
- Are there IFC drawings, engineered plans, or sketches for this job? If yes, what equipment sizes, routes, or configurations do they show?
- What site measurements or field dimensions are available? Include run lengths, heights, distances, or confirmed quantities.
- Are there equipment specs, manufacturer manuals, or submittal sheets? If so, what are the key requirements (amperage, conduit size, pad dimensions, etc.)?
- Are there site photos or a notes summary? Describe any access constraints, existing conditions, or hazards observed on site.
- What is the schedule — start date, deadline, or outage window? How many crew members are planned, and are other trades sequenced around this work?
- What is the generator kW rating and manufacturer / model number?
- Is this a replacement or a new install? If replacement, what is the existing unit?
- Is there an existing ATS or will one be installed — and what is its rating?
- Does the existing pad match the new unit footprint, weight, and anchor pattern, or is pad/foundation work needed?
- What is the rigging path — crane access, gate width, ground bearing, overhead lines, and any road plates or mats?
- What fuel system details are known — fuel type, line size/pressure, day tank, purge/disconnect responsibility, and who owns that scope?
- Does the ATS/switchgear scope include bus work, bypass needs, control wiring changes, or one-line updates?
- Is a utility coordination or shutdown window required?
- Who owns the shutdown request, outage confirmation, and LOTO plan before cutover?
- Is the existing concrete pad adequate for the new unit, or is a new pad required?
- What grounding and bonding details are known — existing electrode system, new rods, bonding jumpers, and NEC Art. 250 verification?
- Are generator, ATS, switchgear, gas piping, or utility work long-lead items that could affect sequence?
- Are concealed conditions likely — masonry penetrations, unknown routing, blocked conduit, abatement, or hidden utilities?

WORK PLAN (PLANNING ESTIMATE — VERIFY CREW AND DURATION)
- 1. Review contract, IFC one-line, submittals, and shutdown responsibilities | crew: PM | duration: 0.5 day | depends on: —
- 2. Verify pad/foundation fit, anchor pattern, rigging path, and fuel tie-in scope | crew: PM + foreman | duration: 0.5 day | depends on: 1
- 3. Coordinate utility outage, LOTO owner, customer notifications, and temporary-power needs | crew: PM | duration: 0.5 day | depends on: 1, 2
- 4. Mobilize, barricade work area, stage crane/lift support, and protect existing gear | crew: 2–3 | duration: 0.5 day | depends on: 3
- 5. Remove existing generator/ATS only if included and de-energized/verified | crew: 2 | duration: 0.5–1 day | depends on: 4
- 6. Set generator on verified pad and complete anchoring/housekeeping checks | crew: 2–3 + rigging vendor | duration: 0.5–1 day | depends on: 2, 4
- 7. Install or replace ATS/switchgear interface and control wiring per drawings | crew: 2 | duration: 0.5–1 day | depends on: 3, 6
- 8. Install conduit/pathway, pull feeder/control conductors, land, torque, label | crew: 2–3 | duration: 1–2 days | depends on: 6, 7
- 9. Complete grounding/bonding checks and fuel-system handoff verification | crew: 2 + fuel contractor as needed | duration: 0.5 day | depends on: 8
- 10. Factory startup, functional test, inspection support, closeout packet, punch list | crew: PM + 2 + factory tech | duration: 0.5–1 day | depends on: 7, 8, 9

MATERIAL PLANNING CATEGORIES (DRAFT ONLY — NOT A FINAL TAKEOFF)
- Generator unit — example: standby generator set, weather enclosure, battery charger, block heater; confirm kW/voltage/phase/model per spec
- Automatic transfer switch / ATS — example: service-rated ATS, bypass/isolation if specified, control terminals; confirm rating and SE-rated requirement
- Switchgear / bus interface — example: lugs, bus adapters, control wiring, one-line changes; verify bus-work, bypass needs, and EoR/AHJ requirements
- Feeder / conductor category — example: phase conductors, neutral, equipment grounding conductor; verify size from IFC drawings/submittals/ampacity calc
- Control cable category — example: start signal, annunciator, battery charger/alarm conductors; confirm conductor count per manufacturer wiring diagram
- Conduit / pathway category — example: EMT/RMC/PVC, fittings, supports, pull boxes, sleeves, firestop; verify type, size, route, fill, and footage
- Grounding / bonding category — example: grounding electrode bonding, jumpers, rods, exothermic clamps if required; verify NEC Art. 250 with qualified review
- Fuel connection category — example: gas line/diesel day tank interface, flex connector, regulator, purge/disconnect; verify licensed fuel / gas contractor scope
- Rigging / lift support category — example: crane, forklift, mats/road plates, lane closure, gate key, spotter; verify rigging vendor plan
- Concrete pad / foundation interface — example: pad enlargement, housekeeping curb, anchor bolts, vibration isolators; verify structural review if in scope
- Labels / signage category — example: equipment labels, arc-flash labels, shutdown signage, panel schedule updates; verify spec/AHJ wording
- Misc hardware category — example: anchors, strut, weatherproof fittings, termination lugs, torque labels, sealant, housekeeping materials

CUSTOMER-SAFE EXPLANATION
- We'll coordinate the shutdown window with you before any work starts.
- We'll verify the pad and protect existing equipment before setting the new unit.
- If we find anything on site that may affect the price or schedule, we'll let you know before doing extra work.
- Start-up and functional test are included — you'll see it running before we leave.

INTERNAL PM / FOREMAN NOTES (NOT CUSTOMER-FACING)
- Existing pad undersized for new unit footprint or weight → may require pad work
- Anchor pattern or housekeeping pad does not match generator submittal → field adjustment or civil/structural review
- Rigging path blocked by gate width, overhead lines, soft ground, or traffic control needs → lift cost/schedule impact
- Fuel line size, pressure, purge/disconnect, or day-tank scope is unclear → fuel contractor / GC coordination needed
- Conductor or conduit sizing mismatch vs. drawings → verify before ordering
- Utility coordination more complex than expected → may affect schedule
- Keep blocker language internal. For customers, use: scope clarification, may affect price or schedule, or contractor review needed.

ASSUMPTIONS
- This is a scope-first planning summary — not a quote, final bid, or approved plan.
- Verify all measurements, materials, access, and approvals against IFC drawings and on site.

DISCLAIMERS
Planning aid only. Not engineering, not code approval, not ready for permit submission, not a final quote, and not a safety sign-off. Verify with the qualified contractor, engineer of record, AHJ, utility, and manufacturer where applicable.
OptionalSharpen your packet — a few quick questions →

Optional and skippable — answering improves your draft. Text only: no customer names, addresses, files, photos, access codes, or payment details. “Not sure / verify on site” is always a safe answer.

Do you have IFC drawings or submittals for the generator and ATS?

IFC drawings from the engineer of record control scope. Answers here flag what is missing for the Munda Field Planner team to review — not a substitute for the drawings.

What is the target generator kW rating and model (if known)?

kW and model are planning placeholders only. Final selection and derating per site conditions, altitude, temperature, and manufacturer spec sheet. Licensed EC + supplier confirm.

What is the physical size / footprint of the existing or proposed generator pad?

Pad dimensions affect rigging, enclosure clearance, and conduit routing. Measure on site or pull from civil drawings. Verify against manufacturer installation instructions.

Is there adequate rigging / crane access and a clear path from delivery point to the pad?

Crane, rigging, or equipment maneuvering may require traffic control, permits, or temporary protection. Flag for change-order risk if site constraints are unknown.

Will the existing fuel system (tank, piping, vents, leak detection) be reused or fully replaced?

Fuel system reuse requires inspection for code compliance (venting, secondary containment, leak detection per local AHJ + NFPA 110 / 37 as applicable). New tank sizing is not calculated here.

What is the utility / power company outage window or preferred cutover timing?

Utility coordination and outage scheduling are owner / utility responsibilities. This note helps sequence the work plan only.

Is temporary power or a rental generator required during the cutover?

Temporary power requirements (load, duration, connection point) are determined by critical loads and AHJ. Not sized here.

What is the planned ATS / service tie-in point and existing service equipment condition?

ATS sizing, bypass, and service equipment condition must be verified against the one-line and utility requirements. Grounding / bonding at the service entrance per NEC 250 + local amendments.

Have permits been pulled or has the AHJ been contacted for this generator install?

Permitting is owner / contractor responsibility. This app produces planning aids only — not permit applications or code submittals.

What are the customer / site access hours and any noise / vibration / exhaust constraints?

Site constraints (HOA, noise ordinances, exhaust routing, neighbor notification) can create change-order events. Captured here for work-plan sequencing.

Are there any known long-lead equipment items (generator, ATS, switchgear, fuel tank)?

Long-lead items affect schedule. Confirm current lead times with suppliers; do not rely on this note for ordering.

Any other site constraints (soil, access road limits, overhead lines, environmental, security)?

Any constraint that may require specialty rigging, matting, or engineering review should be flagged early. Verify on site.

Your packet is ready — copy it

Draft in progress18 items to verifyPlanning aid only

NEC-related values are unverified planning aids until checked against official NEC sources and qualified review (VERIFY-NEC). Not engineering, code review, permit approval, a stamped drawing, a final quote, or safety approval — verify with the licensed team / engineer of record / AHJ.

My packet includes your internal planning notes; the Customer version leaves them out. Both are redacted text only · no files · no payment collected here.

More options (email · print · other copies) →
Email to the Munda Field Planner team

Email opens your own mail app pre-filled — review and press send yourself. Nothing is auto-sent. Redacted text only · no files · no payment collected here.

Field update

Today's field update

Track today's progress on this job, then copy a PM or customer update. Saved on this device only — no account, no upload, nothing sent to a server. Planning aid only.

Today's status

The PM update includes blockers and verify-on-site notes; the customer update leaves internal notes out and makes no engineering, code, permit, or safety-approval claim. Redacted text only · no payment collected here.

Hand off this job

Copy a job bundle and paste it into Munda Field Planner on another device to continue the same job (scope, answers, and field update). This device → paste to share · nothing is sent · redacted text only. Not cross-device sync, no account, no link.

Direct submit isn't enabled in this demo.

This is a static preview with no server. Use Copy redacted scope + answers, Open email draft to the Munda Field Planner team, or Print / Save as PDF above to send your redacted draft. Redacted text only · no files · no payment collected here.

That's it — copy your packet above. Optional feedback and starting over are below.

No app login yet. No uploads in the app yet. Do not send sensitive files. Use text, redacted info, or summaries only. The Munda Field Planner team reviews requests manually. No payment is collected on this site. Planning aid only - not engineering, not ready for permit submission, not code approval, not a final quote, not a safety sign-off.
Step 4

Feedback & start over (optional)

Copy your packet in Step 3above — that's the main action. This part is all optional: clear your answers, or tell us how it went. Your answers stay in this browser unless you choose to copy/email them.

Help us improve this — optional questions

Local interaction log stores event names and timestamps only — never job text, addresses, names, files, or private notes. Data stays in this browser tab and is cleared when the tab closes.

Feedback/demo only. No uploads, no official estimating, no engineering/code/permit/safety reliance.

Advanced: use the old full form instead

Full form fallback

Use this if you already know the job type and want to fill in every field. Text only, no files.

Generator/electrical is our focus today; other trades are welcome as early feedback pilots.

Engineering, permit sign-off, emergencies, gas, and structural issues may be out of scope - the Munda Field Planner team will let you know.

Quick feedback

One tap opens an email to the Munda Field Planner team — no private job details are added.

Advanced: session diagnostics (on-device only)

Event names + counts stored in your browser only. No job text, names, contacts, files, or locations are ever recorded or sent.

12 optional questions left